Invitation for Bids:

 The Office of Prime Minister, Government of Cook Islands invites sealed bids from eligible Bidders for the design, construction, installation, completion and commission of renewable energy facilities as shown below:

  • Part 1 – Atiu hybrid renewable energy system, comprising solar plant, powerhouse with battery energy storage system (BESS), integrated with existing diesel generators for backup power supply and connected to the grid
  • Part 2 – Mangaia hybrid renewable energy system, comprising solar plant, powerhouse with battery energy storage system (BESS), integrated with existing diesel generators for backup power supply and connected to the grid
  • Part 3 – Mauke hybrid renewable energy system, comprising solar plant, powerhouse with battery energy storage system (BESS) and diesel generators for backup power supply, fully integrated and connected to the grid
  • Part 4 – Mitiaro hybrid renewable energy system, comprising solar plant, powerhouse with battery energy storage system (BESS) and diesel generators for backup power supply, fully integrated and connected to the grid

To obtain further information, prospective bidders should go to www.procurement.gov.ck (reference 151625).  For queries and to obtain an electronic copy of the bidding documents, please contact Tangi Tereapii on 29300 or e-mail, tangi.tereapii@cookislands.gov.ck.

The deadline for submissions is 18 March 2016, 12:00 midday.  Bids will be opened immediately after the deadline for bid submission in the presence of the Bidders’ representatives who choose to attend. Late bids will be rejected.